Boeing aims to finish software fix to 737 Max in September
The plan is a sign that the troubled plane likely won't fly until late 2019 after it was grounded in March. |!| Grand Rapids
The plan is a sign that the troubled plane likely won't fly until late 2019 after it was grounded in March. |!| Grand Rapids